Seren Park - Cladding Replacement
Welcome to the Seren Park Scheme Microsite. Here you will find the latest news, updates of works being carried out on site, contact details for site staff, event information, photos, and resident documents.
Completing this scheme on behalf of Seren Park Gardens RTM Company Ltd is Equans and Martin Arnold, details on their roles and responsibilities can be found below:
Martin Arnold Ltd – Contract Administrator
Martin Arnold are the designers of the cladding remedial works. Martin Arnold will project manage the works on behalf of Seren Park Gardens RTM Company Ltd and administer the formal building contract between Seren Park Gardens RTM Company Ltd and Equans. Martin Arnold will also have a daily Clerk of Works on site who will be inspecting the quality of the workmanship.
Equans - Contractor
Equans has been successfully appointed to undertake the removal and replacement of the existing external cladding at Seren Park Gardens.
As per Seren Park Gardens RTM Company Ltd requirements, the cladding panels will be removed and replaced in sections and instalments, ensuring each flat remains watertight at the end of each working day.
HAUS
HAUS Block Management are the property managers on behalf of Seren Park Gardens RTM. If you have cladding related questions to ask HAUS, please make contact through the HAUS portal on http://h-portal.co.uk or sign up to the portal if you have not already done so.
Alternatively, you can contact HAUS on SerenParkGardens-cladding@h-bm.co.uk for additional information or if you have any questions.
Welcome to the Seren Park Scheme Microsite. Here you will find the latest news, updates of works being carried out on site, contact details for site staff, event information, photos, and resident documents.
Completing this scheme on behalf of Seren Park Gardens RTM Company Ltd is Equans and Martin Arnold, details on their roles and responsibilities can be found below:
Martin Arnold Ltd – Contract Administrator
Martin Arnold are the designers of the cladding remedial works. Martin Arnold will project manage the works on behalf of Seren Park Gardens RTM Company Ltd and administer the formal building contract between Seren Park Gardens RTM Company Ltd and Equans. Martin Arnold will also have a daily Clerk of Works on site who will be inspecting the quality of the workmanship.
Equans - Contractor
Equans has been successfully appointed to undertake the removal and replacement of the existing external cladding at Seren Park Gardens.
As per Seren Park Gardens RTM Company Ltd requirements, the cladding panels will be removed and replaced in sections and instalments, ensuring each flat remains watertight at the end of each working day.
HAUS
HAUS Block Management are the property managers on behalf of Seren Park Gardens RTM. If you have cladding related questions to ask HAUS, please make contact through the HAUS portal on http://h-portal.co.uk or sign up to the portal if you have not already done so.
Alternatively, you can contact HAUS on SerenParkGardens-cladding@h-bm.co.uk for additional information or if you have any questions.
-
NEW LETTER: Balcony Scaffolding Works
This article has been summarised, a full copy of the letter is available within the documents library.
We will be erecting scaffolding tubes from the ground floor through your balconies up to the top floor. The scaffolding will allow us to remove the balcony decking at a later date.
Works commencing from Wednesday 23rd June 2022.
We thank you for your co-operation and we will keep you updated as works progress.
Any queries or concerns regarding the works should be directed to your RLO, Christine by calling her on 07766 440 977.
-
NEW LETTER: 1st Floor residents - Restricted access to balconies and/or patio, Flats 1 and 2
This article has been summarised, a full copy of the letter is available within the documents library.
Please note that from Wednesday 23rd June 2022, ground works will consist of the removal of the front walls, flower beds and decking on your balcony. In order for us to carry out these works this will restrict any access you have to your balcony/patio. Please kindly remove all your personal items i.e. plants, garden furniture, bikes and bird netting, as we cannot be responsible for any damage caused.
We apologise for any inconvenience caused and will keep you updated as works progress. If you have any queries, then please do no hesitate to contact your Resident Liaison Officer, Christine Todd on 07766 420 977.
-
Roof Level Works Update
To enable EQUANS to undertake our works we require the temporary disconnection of all external water and electrical services that pass through the external walls of your flat. This is in addition to the need to move plants, garden furniture etc away from the walls.
To identify the items that need to be moved and those that can stay, we would like to inspect your flat. We will send you a suggested appointment date and time shortly for the inspection. Once you receive the appointment, please let your Resident Liaison Officer, Christine know if the proposed appointment is convenient or you'd like to re-arrange it.
Once items have been identified that need moving please make the necessary arrangements to undertake these disconnections, movement of furniture etc. If this will provide difficult for you, EQUANS can provide skilled operatives to undertake the necessary works for a fee.
Similarly, EQUANS can, upon our completion of the cladding works, provide a service to reinstate items, again for a fee.
If you have any queries, then please do no hesitate to contact your Resident Liaison Officer, Christine Todd on 07766 420 977.
A copy of this full letter can also be found within the Documents Library.
-
Podium Works
We would like to update you on the progress of the scaffolding to the building. As you will have seen scaffolding is now well underway at both ends of the building adjacent Restell Close. The scaffolding will continue being erected to the rear of the building adjacent to the access roadway until all rear elevations have been scaffolded. It is anticipated that this will be the end of June 2022.
The scaffolding to the elevations facing the podium have been scheduled to commence in July 2022. This follows investigations by our Structural Engineer into the construction of the podium; the precise method on construction found to be used means there is an increased risk as it is too weak to allow a scaffold to be stood on it directly. Risk mitigation means it requires steel beams.
To allow the beams to be laid on the podium, the swarf walls and fences adjacent the entrance doorways and around the gardens of the podium level flats must be removed. They will be reinstated following completion of the cladding works in Jun 2023. The steelwork and associated scaffold will therefore make the gardens of the podium level flats unusable during this time.
The Structural Engineer is currently finalising their design and once completed we will be able to update you further.
EQUANS, Martin Arnold and the RTM are currently working with the BSF to ensure that these additional structural loading works to the podium will be Government-funded and the cost will not fall to leaseholders.
The use of the steel beams at odium level means that we do not have to put large numbers of props in the car parking area beneath the podium, which would have meant substantial numbers of car parking spaces being out of use for long period of time. We appreciate the steel beams will be an inconvenience, however we agree it is preferable to the loss of many car parking spaces.
Parking around site and vehicle access has been extremely tight. In order to reduce the footprint of the scaffolding sticking out around the outside of the building and so minimise disruption to services like bin collection etc. it will now be necessary to fit some of the support poles directly through the decking of the majority of the balconies. We confirm that those affected balconies will need to be cleared to allow the poles to be fitted.
We confirm that your balcony needs to be cleared to allow the scaffold pole to be fitted. Once completed items can be put back on the balcony until we are ready to remove your cladding. However, please be aware that any items stored on the balcony will receive a layer of dust, unless covered. This is an inevitable consequence of works being carried out to neighbouring balconies. We strongly recommend that you do not place items easily damaged on the balcony at any time during the works. We will not be held responsible for any damages to personal items etc. plants, garden furniture, sheds bikes.
If you have any questions then please do not hesitate to contact your Resident Liaison Officer, Christine Todd on 0776 420 977.
-
Roof Level Works
To enable the cladding works to be carried out to your flat it will be necessary to move plant containers, garden furniture, sheds, temporary structures etc. that stands adjacent the cladding. This is to give the operatives access to the cladding to the walls and decking adjacent the base of the walls. Typically, this will involve moving plant containers of furniture one metre/three feet away from the wall. Additionally, items fixed to the cladding, for example hanging baskets, hose reels etc. will have to be taken off.
We will be in touch shortly to arrange a visit to your property with the contractor to identify which items need to be moved. This is to ensure that items are not moved unnecessarily and that all items are removed in good time so that the progress of the works are not hampered. Timescales can also be discussed so that you are aware of when items need to be moved and when it is anticipated they can be returned to minimise the inconvenience to you of these outdoor spaces.
We appreciate that some of the items that need to be moved will cause significant disruption and may require you to arrange for you own contractor to move the larger items of equipment. Further, we can see that there are areas of cladding that must be changed that are now inside rooms. We will therefore work with you to minimise the inconvenience of these very necessary works being carried out.
We anticipate sending an appointment to view your property shortly to begin the process of getting your cladding changed. Your cooperation in this matter is much appreciated and we will endeavour to keep disruption to a minimum.
If you have any queries, then please do no hesitate to contact your Resident Liaison Officer, Christine Todd on 07766 420 977.
-
Podium Access
Whilst works and loading of materials to the podium are in process, there will be at times limited access to certain areas of the podium. Signs and fencing will be put in place and fencing where works are being carried out to keep you informed and safe.
We apologise for any inconvenience caused and will keep you updated as works progress.
-
NEW LETTER: Block C1 Scaffolding Works
This article has been summarised, a full copy of the letter is available within the documents library.
EQUANS will need to start scaffolding works in the car park area to the rear of Block C1 (properties 99-150) this area will have limited access during these works. If you need any assistance during these works, please do not hesitate to call your RLO, Christine.
Any queries or concerns regarding the works should be directed to your RLO, Christine by calling her on 07766 440 977.
-
NEW LETTER: Balcony clearance - Ground floor residents
This article has been summarised, a full copy of the letter is available within the documents library.
Please note that on Monday 20th June 2022, all balconies should be cleared. Ground works will consist of the removal of the front walls, flower beds and decking on your balcony. In order for us to carry out these works this will restrict any access you have to your front garden area.
Please kindly remove all personal items i.e. plants, garden furniture, bikes, bird netting etc. if any items are still left on the balconies, EQUANS will move these onto the podium and will not be held responsible for any damages that could be caused in removing any personal items.
We thank you for your co-operation and we will keep you updated as works progress.
Any queries or concerns regarding the works should be directed to your RLO, Christine by calling her on 07766 440 977.
-
Containers On Site
We will be loading 3 large storage containers onto the podium/playground area on TUESDAY 17TH MAY. Our lorry will be parked in front of the underground car park gates between 8am and 5pm. We will have traffic marshals on site to ensure that residents will be still able to enter and leave.
We apologise for any inconvenience caused and will keep you updated as works progress.
-
Site team changes
Please be advised that a number of changes have happened within the site team for Seren Park.
Site Manager, Anthony Amayo and Senior Resident Liaison Officer, Maureen Myles have now left the project. Whilst there is currently no plan to replace Anthony, Maureen has been replaced by new Senior Resident Liaison Officer, Christine Todd.
We wish the best of luck to Anthony and Maureen on their future projects and please join us in welcoming Christine to the team.
In line with these changes we have also updated our Resident Information Pack which can be found within the Documents Library.
A copy of the below site team change flyer can also be found within the Documents Library.
Our working hours
Meet the Team
-
Phone 0333 121 0067 -
Phone 07815 028 625 Email gary.beasley@equans.com
Site Plan
Documents
-
Resident Newsletters
- Resident Newsletter - Dec 2024 and Jan 2025 (464 KB) (pdf)
- Resident Newsletter_Aug & Sep24 (1.76 MB) (pdf)
- Resident Newsletter_Jun24 (1.65 MB) (pdf)
- Resident Newsletter_Mar24 (2.6 MB) (pdf)
- Resident Newsletter_Nov23 (3.11 MB) (pdf)
- Resident Newsletter_Jun23 (1.76 MB) (pdf)
- Resident Newsletter_NovDec22 (1.83 MB) (pdf)
- Resident Newsletter_Sep22 (2.46 MB) (pdf)
- Resident Newsletter_Jul/Aug22 (1.08 MB) (pdf)
- Resident Newsletter_Mar-Apr22 (989 KB) (pdf)
- Resident Newsletter_Feb22 (627 KB) (pdf)
-
Construction Drawings
- ENG 2020-1168-03D High level plan Seren Park.pdf (1.19 MB) (pdf)
- ENG 2020-1168-04E GA PLAN LHS Seren Park.pdf (1.06 MB) (pdf)
- ENG 2020-1168-02D Mid level plan Seren Park.pdf (1.22 MB) (pdf)
- Cat III Check Sheet for GWCoote (Seren Park - Access Scaffold).pdf (428 KB) (pdf)
- ENG 2020-1168-01E Ground level plan Seren Park.pdf (1.47 MB) (pdf)
- ENG 2020-1168-05E GA PLAN RHS Seren Park.pdf (834 KB) (pdf)
- ENG 2020-1168-07E Sections E,F,G,H Seren Park.pdf (764 KB) (pdf)
- ENG 2020-1168-06D Sections A,B,C,D Seren Park.pdf (719 KB) (pdf)
- ENG 2020-1168-08E Sections K,M,P Seren Park.pdf (908 KB) (pdf)
- ENG 2020-1168-09D Sections T&V Seren Park.pdf (703 KB) (pdf)
- ENG 2020-1168-01 Calcs -Seren Park.pdf (655 KB) (pdf)
-
Proposed Drawings
- 3217-MA-N-DT11-DR-4751-T00.pdf (478 KB) (pdf)
- 3217-MA-N-DT15-DR-4755-T00 .pdf (600 KB) (pdf)
- 3217-MA-N-DT16-DR-4256-T00.pdf (611 KB) (pdf)
- 3217-MA-N-DT17-DR-4757-T00.pdf (599 KB) (pdf)
- 3217-MA-N-DT27-DR-4767-T00.pdf (824 KB) (pdf)
- 3217-MA-N-DT18-DR-4758-T00.pdf (610 KB) (pdf)
- 3217-MA-N-DT28-DR-4768-T00.pdf (680 KB) (pdf)
- 3217-MA-N-DT27-DR-4767-T00.pdf (824 KB) (pdf)
- 3217-MA-N-DT41-DR-4781-T00.pdf (664 KB) (pdf)
- 3217-MA-N-DT46-DR-4786-T00.pdf (855 KB) (pdf)
- 3217-MA-N-DT47-DR-4787-T00.pdf (462 KB) (pdf)
- 3217-MA-N-DT48-DR-4788-T00.pdf (412 KB) (pdf)
- 3217-MA-N-DT49-DR-4789-T00.pdf (418 KB) (pdf)
- 3217-MA-N-EL(E)-DR-2801-T00.pdf (639 KB) (pdf)
- 3217-MA-N-EL(E)-FS-DR-2811-T00.pdf (653 KB) (pdf)
- 3217-MA-N-EL(N)-DR-2800-T00.pdf (644 KB) (pdf)
- 3217-MA-N-EL(N)-FS-DR-2810-T00.pdf (653 KB) (pdf)
- 3217-MA-N-EL(S)-FS-DR-2812-T00.pdf (580 KB) (pdf)
- 3217-MA-N-EL(W)-DR-2803-T00.pdf (715 KB) (pdf)
- 3217-MA-N-EL(W)-FS-DR-2813-T00.pdf (701 KB) (pdf)
- 3217-MA-N-EL-DR-2820-T00.pdf (332 KB) (pdf)
- 3217-MA-N-SL-DR-0200.pdf (486 KB) (pdf)
- 3217-MA-N-EL(S)-DR-2802-T00.pdf (597 KB) (pdf)
-
Letters
- Site Compound removal and completion of works - Jan 2025 (100 KB) (pdf)
- Broken balcony balustrade glass panel_May24 (143 KB) (pdf)
- Scaffold strike_Section 2 and corner of Section 6_Oct23 (120 KB) (pdf)
- Zinc stripping 24 - 25 Seren Park_Oct23 (121 KB) (pdf)
- Zinc Stripping and Installation 188_Oct23 (122 KB) (pdf)
- Balcony Zinc Cappings 31-62_Oct23 (127 KB) (pdf)
- Balcony Zinc Cappings_113-148_Oct23 (127 KB) (pdf)
- Update on Works Letter_Sep23 (94.9 KB) (pdf)
- Update on Works Letter_Aug23 (94.5 KB) (pdf)
- Balcony Zinc Cappings_Jun23 (126 KB) (pdf)
- Commencing Zinc stripping_Jun23 (121 KB) (pdf)
- Zinc cappings installation to balconies_Jun23 (126 KB) (pdf)
- Dismantling hoist and relocating from Section 2 to Section 3_Feb23 (156 KB) (pdf)
- Scaffolding erection inset balconies_Section 5 & 6_Jan23 (152 KB) (pdf)
- Section 1 - Dismantling hoist and relocating to corner of section 4_Jan23 (124 KB) (pdf)
- Section 6 - Render and cladding removal and balcony clearance_Jan23 (131 KB) (pdf)
- Recomencing Zinc stripping_Jun23 (121 KB) (pdf)
- Section 5 part of B2 C1 B1 A1 - render and cladding removal and balcony clearance_Oct22 (132 KB) (pdf)
- Zinc stripping on Section 5 and Section 6_Mar23 (120 KB) (pdf)
- Scaffold strike letter Section 2 Levels 9 and 8_Mar23 (122 KB) (pdf)
- External Works_SectionA1_Entrance Exit Door Temporary Closure Safety Letter_Jun22 (142 KB) (pdf)
- Temporary no access vehicle entrance exit to underground car park_Jun22 (147 KB) (pdf)
- Balcony Scaffolding and Balcony Clearance Section 6GB_Oct22 (151 KB) (pdf)
- Render Cladding Removal Reminder_Jun22 (368 KB) (pdf)
- Balcony Scaffolding Works Letter_Jun22 (145 KB) (pdf)
- Cladding removal and balcony clearance_Aug22 (128 KB) (pdf)
- Fire Drill Practice_EQUANS Staff Only_Jul22 (353 KB) (pdf)
- Ground Floor Balcony Clearance Letter_May22 (145 KB) (pdf)
- 1st Floor Residents - Restricted Access Flats 1 & 2 Balconies Patios Letter_Jun22 (150 KB) (pdf)
- Render Cladding Removal Block C1 and part section B2 Letter_Jun22 (368 KB) (pdf)
- Roof Level works Letter_Jun22 (143 KB) (pdf)
- Block C1 Balcony Scaffolding Letter_May22 (259 KB) (pdf)
- Roof Level Works Letter_May22 (145 KB) (pdf)
- Draught Podium Works Letter_May22 (145 KB) (pdf)
- Completion programme - update 16.12.24 (450 KB) (pdf)
- Completion Programme_13.05.24 (638 KB) (pdf)
- Halloween Activity Pack (990 KB) (pdf)
- Site Team Change Flyer_May22 (875 KB) (pdf)
- Seren Park Resident Information Pack_May22 (9.25 MB) (pdf)
- Summer Activity Pack (1.63 MB) (pdf)
Photos
Phase of Works - Milestones
-
Phase 1
Seren Park - Cladding Replacement has finished this stageSite set up. Erecting hoarding to the welfare area situated at the bottom of Restell Close. Installing temporary services, water and electric. Delivery and siting of welfare containers, offices, toilets, storage containers etc.,
Carrying out various surveys on site to enable the working designs for the new cladding, Off-site works, preparing drawings for cladding including commencement of fabrication for these items.
-
Phase 2
Seren Park - Cladding Replacement has finished this stageScaffold erection to blocks A1 & A2
-
Phase 3
Seren Park - Cladding Replacement is currently at this stageMain works commence, removal and reinstatement of external cladding and balcony refurbishments.
-
Phase 4
this is an upcoming stage for Seren Park - Cladding ReplacementWorks completing. Scaffold strike completing, remedial works to podium hard landscaping, demobilisation of site set up and site clearance.